Stiffness matrix

From formulasearchengine
Revision as of 20:58, 10 October 2013 by en>Compsonheir (Practical assembly of the stiffness matrix: fixed an error, D matrix is 2x3)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search



2011 Acura TSX Sport Wagon-There are just some of us all around who would never drive an suv or a minivan but need something practical for family duties. The Acura TSX is one in all my favorite cars in sedan form but I felt that the wagon deserved special mention for bringing luxury, style, class and driving fun into the family transportation segment.

When my hubby brought this finding to the eye of the Ft. Wayne Indiana Toyota dealer, i was told that they would look into the matter. After wasting 7 days before actually doing everything to change this lease, i was told exercises, diet tips too newer. The salesman never offered us this wonderful deal, and the sales manager told us their dealership gave us the best deal toyota tundra off road they would probably. In the same sentence the sales team leader told us we qualified for the cheaper offer. In all honesty they didn't give us the cheapest price they can have. They gave us the highest lease price we were willing with regard to. My credit score is excellent, but it wouldn't have designed a difference for this dealership. After we had shopped around precisely what you want our lease, we might have definitely got a new better deal.

Now, Certain understand why Toyota doesn't offer the SE with rear seat DVD entertainment since most parents discovered that to be an indispensible feature nowadays. Besides that toyota tundra tuning the 3.5 liter V6 emits a lion-like and throaty roar under heavy acceleration that your call don't expect from a clever minivan. Do note I did not have a chance to drive a car the 2011 Honda Odyssey yet when I had the outcome might happen to different. We'll see this year.

Brian Ickler will make his begin of 2011 in the Kyle Busch Motorsports #18 Dollar General Toyota Tundra at Texas Motor Speedway on Friday, June 10. The WinStar World Casino 400K is being run when partnered with the IZOD IndyCar Series Twin 275s on Saturday, June eleventh.

The level came when he was a college junior. He'd just won the co-angler division for this 1994 Bassmaster Top 100 on Lake Norman. Diet plans . only or even bass tournament he'd ever entered.

16-year-old Erik Jones brought home his second top finish because many races in the absolutely no. 51 SUV for Kyle Busch Motorsports, finishing ninth in Sunday's NC Education Lottery 200 at Rockingham Speedway. Jones started at the tail-end belonging to the field in 36th, dropping a lap early along. The "lucky dog" award put him back with the lead lap, and Jones climbed in the top 10 in morrison a pardon stages belonging to the 200-lap race, which was won by Kyle Larson.

Another disadvantage in the Platinum package continually that it adds more chrome trim with regard to an exterior overburdened with it and forces Toyota to stoop a new low no Japanese truck maker has ever gotten to. Yes, the Tundra Platinum comes standard with chrome wheels. They are as tacky just like the optional Red Rock Leather (that really looks orange) and the cheesy half wood/half leather steering interior.

Then either the CrewMax Limited Platinum Package which pulls out all of the stops with vented and heated seats, wood grain style trim and a sunroof. Three cab sizes can be had - regular, double and CrewMax. The Tundra also has three wheelbase and bed lengths. Quite a few options? Not what this means you can build ultimate truck, get style, performance and practicality and always be able to cover it. A power optimizer is a DC to DC converter technology developed to maximize the energy harvest from solar photovoltaic or wind turbine systems. They do this by individually tuning the performance of the panel or wind turbine through maximum power point tracking, and optionally tuning the output to match the performance of the string inverter. Power optimizers are especially useful when the performance of the power generating components in a distributed system will vary widely, differences in equipment, shading of light or wind, or being installed facing different directions or widely separated locations.

Power optimizers for solar applications, can be similar to microinverters, in that both systems attempt to isolate individual panels in order to improve overall system performance. A smart module is a power optimizer integrated into a solar module. A microinverter essentially combines a power optimizer with a small inverter in a single case that is used on every panel, while the power optimizer leaves the inverter in a separate box and uses only one inverter for the entire array. The claimed advantage to this "hybrid" approach is lower overall system costs, avoiding the distribution of electronics.

Description

Maximum power point tracking (MPPT)

Most energy production or storage devices have a complex relationship between the power they produce, the load placed on them, and the efficiency of the delivery. A conventional battery, for instance, stores energy in chemical reactions in its electrolytes and plates. These reactions take time to occur, which limits the rate at which the power can be efficiently drawn from the cell.[1] For this reason, large batteries used for power storage generally list two or more capacities, normally the "2 hour" and "20 hour" rates, with the 2 hour rate often being around 50% of the 20 hour rate.[2]

Typical cell I-V curves showing the relationship between current, voltage and total output for differing amounts of incoming light.

Solar panels have similar issues due to the speed at which the cell can convert solar photons into electrons, ambient temperature, and a host of other issues. In this case there is a complex non-linear relationship between voltage, current and the total amount of power being produced, the "I-V curve".[3] In order to optimize collection, modern solar arrays use a technique known as "maximum power point tracking" (MPPT) to monitor the total output of the array and continually adjust the presented load to keep the system operation at its peak efficiency point.[4]

Traditionally, solar panels produce voltages around 30 V.[5] This is too low to be effectively converted into AC to feed to the power grid. To address this, panels are strung together in series to increase the voltage to something more appropriate for the inverter being used, typically about 600 V.[6]

The drawback to this approach is that MPPT system can only be applied to the array as a whole. Because the I-V curve is non-linear, a panel that is even slightly shadowed can have dramatically lower output, and greatly increase its internal resistance. As the panels are wired in series, this would cause the output of the entire string to be reduced due to the increased total resistance. This change in performance causes the MPPT system to change the operation point, moving the rest of the panels away from their best performance.[7]

Because of their sequential wiring, power mismatch between PV modules within a string can lead to a drastic and disproportionate loss of power from the entire solar array, in some cases leading to complete system failure.[8] Shading of as little as 9% of the entire surface array of a PV system can, in some circumstances, lead to a system-wide power loss of as much as 54%.[9] Although this problem is most notable with "large" events like a passing shadow, even the tiniest differences in panel performance, due to dirt, differential aging or tiny differences during manufacturing, can make the array as a whole operate away from its best MPPT point. "Panel matching" is an important part of solar array design.

Isolating panels

These problems have led to a number of different potential solutions that isolate panels individually or into much smaller groups (2 to 3 panels) in an effort to provide MPPT that avoids the problems of large strings.

One solution, the microinverter, places the entire power conversion system directly on the back of each panel. This allows the system to track the MPPT for each panel, and directly output AC power that matches the grid. The panels are then wired together in parallel, so even the failure of one of the panels or microinverters will not lead to a loss of power from the string. However, this approach has the disadvantage of distributing the power conversion circuitry, which, in theory, is the expensive part of the system. Microinverters, at least as late as early 2011, had significantly higher price per watt.

This leads, naturally, to the power optimizer concept, where only the MPPT system is distributed to the panels. In this case the conversion from DC to AC takes place in a single inverter, one that lacks the MPPT hardware or has it disabled. According to its supporters, this "hybrid" approach produces the lowest-cost solution overall, while still maintaining the advantages of the microinverter approach.

Major players

According to an IMS Research report from September 2012, BMSolar, Tigo Energy, SolarEdge Technologies Inc. and Enphase Energy accounted for more than 90 percent of micro inverter and power optimizer shipments in 2011.[10]

Notes and references

43 year old Petroleum Engineer Harry from Deep River, usually spends time with hobbies and interests like renting movies, property developers in singapore new condominium and vehicle racing. Constantly enjoys going to destinations like Camino Real de Tierra Adentro.

  1. Venkat Srinivasan, "The Three Laws of Batteries", GigaOm, 18 March 2011
  2. Isidor Buchmann, "Discharge methods", Battery University
  3. N. Shenck, "PV Power Systems: PV Theory II", MIT
  4. "What is Maximum Power Point Tracking and How Does it Work?", BlueSky Energy
  5. SolarWorld's SW 245 is a typical modern panel, using 6" cells in a 6 by 10 arrangement and a Voc of 30.8 V
  6. SMA's SunnyBoy series comes in US and European versions, and generally suggest 500 to 600 VDC inputs.
  7. "Increase Power Production", eIQ Energy
  8. Chaintreuil, N. et al. “Effects of Shadow on Grid Connected PV System” INES R.D.I. Laboratory for Solar Systems (L2S), Le Bourget-du-Lac, France. Bruendlinger, R. et al. “Maximum Power Point Tracking Performance Under Template:SicShaded PV Array Conditions” Paper submitted to the 21st European Photovoltaic Solar Energy Conference, 4-8 September 2008, Dresden, Germany.
  9. Muenster, R. [“Shade Happens”] Renewable Energy World.com http://www.renewableenergyworld.com/rea/news/article/2009/02/shade-happens-54551 2009-02-02. Retrieved on 2009-03-09.
  10. [1]